安装6吨热水锅炉完成后的验收项目有哪些?

作者:http://www.hntkglgs.com | 浏览:0 次
19
5
2017
Comprehensive inspection shall include at least the following items:
全面检查至少包括下列项目:
1., pot inspection: drum internal parts installation is correct, is there any tools or debris left in the furnace?. The manhole and hand hole can be closed before checking.
1.6吨热水锅炉锅内检查:锅筒内部件安装是否正确,是否有工具或杂物遗留在炉内。经检查确认后方可关闭人孔、手孔。
2., outside the examination: the main inspection furnace, flue internal accumulation or blockage, the furnace internal wall is intact, whether there are cracks, convex brick, fall off phenomenon.
2.锅外检查:主要检查炉膛、烟道内部是否有积存物或堵塞,炉膛内墙是否完好,有无裂缝、凸砖、脱落现象。
3. fire grate inspection: check the necessary gap between the movable part of the grate and the fixed part, and check whether the handle of the movable grate is free or not, whether it can reach the required position or not.
3.炉排检查:主要检查炉排活动部分与固定部分之间的必要间隙,检查活动炉排的扳动手柄推拉是否自如,能否达到规定位置。
4. fan inspection: to fan inspection, first hand plate, dynamic coupling or drive V-belt, inspection, inspection, movement, static two parts, whether there is friction, collision, stuck and other anomalies. Fan inlet control board switch should be flexible and tight.
4.风机检查:对风机检查,先用手盘动联轴器或传动三角带,检查检查动、静二部分有无摩擦、碰撞、卡住等异常情况。风机入口调节板开关应灵活严密。
5. other checks:
 5.其他检查:
Check all piping and valves in Sheung Shui system (including water treatment, boiler feed pump).
检查上水系统(包括水处理、锅炉给水泵)所有的管道、阀门。
Check all piping and valves in the blowdown system.
检查排污系统所有的管道、阀门。
Check all piping and valves in the blowdown system.
检查供汽系统所有的管道、阀门及保温层。

Check the dust seal of the dust collector. 